Legacy contact centre decommissioning
Switch off the old platform, and actually bank the saving
The saving in a cloud migration only arrives when the old platform is switched off. Yet decommissioning is often left to the end, unplanned and unfunded, so organisations keep paying for servers, licences, circuits and support contracts long after the last agent has moved.
We plan the switch-off from day one, so every piece of the old estate has an owner, a date and a saving attached.
What you get
Every item owned, dated and costed
On a global estate, the old platform is rarely one system. It’s hundreds of items spread across data centres, sites and branches, many with their own contracts. Switching them off safely, and on time, is often where most of the saving is won or lost.
- ✓ A complete estate register. Every server, gateway, circuit, licence, recorder, IVR and integration, in every data centre, large site and branch, with its owner, contract and running cost. Anything not yet confirmed is flagged as unknown and chased.
- ✓ Contract notice periods mapped. Licence, maintenance, telephony and hosting contracts lined up against the migration waves, so notices go in on time and you don’t roll into another year of support.
- ✓ Recording and data retention handled. Call recordings, chat transcripts and customer data kept, moved or deleted in line with your regulatory and legal obligations, with a clear record of what went where.
- ✓ Phased switch-off with gates. Each part of the estate is switched off only when its gate is passed: traffic moved, nothing still depending on it, data retained and sign-off given.
- ✓ Certified disposal. Hardware wiped and disposed of or recycled by certified providers, with certificates kept for audit.
- ✓ Energy and carbon. The power and carbon saved by switching off old hardware, ready for your sustainability reporting.
How it works
Register, plan, retain, switch off, dispose
- 1
Register
Build the estate register from discovery, contracts and your teams’ knowledge.
- 2
Plan
Link each item to a migration wave, a notice date and a switch-off gate.
- 3
Retain
Settle recording and data retention before anything is switched off.
- 4
Switch off
Item by item, gate by gate, with a dark period where needed to prove nothing breaks.
- 5
Dispose and report
Certified disposal, contracts closed, and the savings confirmed against the business case.
Questions we’re often asked
FAQ
When should decommissioning planning start?
At the start of the migration. Notice periods on licences and support contracts can be 3 to 12 months, so the switch-off plan shapes the migration plan, not the other way round.
What happens to our call recordings?
We agree with your compliance and legal teams which recordings must be kept and for how long, then keep, migrate or securely delete them before the old recorders are switched off.
Can you do decommissioning on its own?
Yes. If your migration is already under way or finished, we can build the estate register and run the switch-off on its own.
Do you dispose of the hardware?
We arrange disposal through certified providers and keep the certificates for your audit records.
Talk to us about decommissioning
Still paying for a platform you’ve moved off? Let’s find the saving.