Contact centre migration programmes
Move your contact centre to the cloud without losing control of the programme
Most contact centre migrations don’t fail on technology. They fail because the business case is built once to win approval and never looked at again, new ideas pull the go-live team off go-live, and nobody can show the return once it’s live.
We run migrations differently: a real number early, a plan tied to your contract dates, and one set of numbers from the first estimate to the last benefit.
What you get
One programme, one set of numbers
The Velvet Rope
Two teams, one go-live
- ✓ A business case in three scenarios. Conservative, expected and stretch: the one-off cost with contingency, the annual saving, cost per contact, payback and the five-year net. Anything not yet known is shown as unknown, never as zero.
- ✓ A plan tied to your contracts. A pilot, then migration waves sequenced around the notice periods and end dates of your current contracts, so you stop paying twice as early as possible.
- ✓ Weekly programme packs. One short weekly update from the team produces the executive, steering and project packs, so they always agree with each other.
- ✓ Stabilisation. A planned period after each wave go-live to fix issues fast, tune routing and settle agents before the next wave moves.
- ✓ The return, month by month. Spend and benefits tracked against the business case, so the board sees the saving proven, not just claimed.
How it works
From business case to switch-off
- 1
Business case
Today’s platform, size, dates and costs, turned into the three scenarios.
- 2
Plan and team
The phases from discovery to decommissioning, the Day One and What’s Next teams, and the client roles.
- 3
Pilot
A contained first group of agents to prove the design.
- 4
Waves
The rest of the estate, in waves sized to your operation and your contract dates.
- 5
Stabilise and switch off
Each wave settled, then the old platform switched off. Decommissioning →
Why it matters
Methods proven at global scale
Jamie Easton-Wise led the move of American Express’s global contact centre operation to the cloud: 34 centres in 27 countries, 200 million calls and 50 million chats. The methods on this page come from doing that, across many regulators, languages and labour rules.
Questions we’re often asked
FAQ
How long does a contact centre migration take?
It depends on size and contracts. A single-site operation can move in a few months; a large multi-country estate usually runs in waves over 12 to 24 months.
Do you replace our systems integrator?
No. We work alongside your chosen vendor and integrator, owning the plan, the business case and the governance so the programme stays on track.
What is the Velvet Rope?
Our way of protecting go-live. A Day One team works only on what’s essential to go-live; every other idea is logged and routed to a separate What’s Next team.
How do you prove the saving?
Every month we record actual spend and benefits against the approved business case, so return on investment and payback are tracked, not estimated after the fact.
Talk to us about your migration
Planning a move, or stuck partway through? We’ll tell you honestly where you stand and what it will take.